Skip to main content

Consortium for Mathematics and its Applications

Mathmodels.org
Resource Type: Contest Problem
Primary Level: Undergraduate

The Coal-Tipple Operations Problem

Author: COMAP


Background:

The Aspen-Boulder Coal Company runs a loading facility consisting of a large coal tipple. When the coal trains arrive, they are loaded from the tipple. The standard coal train takes 3 hours to load, and the tipple’s capacity is 1.5 standard trainloads of coal. Each day, the railroad sends three standard trains to the loading facility, and they arrive at any time between 5 A.M. and 8 P.M. local time. Each of the trains has three engines. If a train arrives and sits idle while waiting to be loaded, the railroad charges a special fee, called a demurrage. The fee is $5,000 per engine per hour. In addition, a high-capacity train arrives once a week every Thursday between 11 A.M. and 1 P.M. This special train has five engines and holds twice as much coal as a standard train. An empty tipple can be loaded directly from the mine to its capacity in six hours by a single loading crew. This crew (and its associated equipment) costs $9,000 per hour. A second crew can be called out to increase the loading rate by conducting an additional tipple-loading operation at the cost of $12,000 per hour. Because of safety requirements, during tipple loading no trains can be loaded. Whenever train loading is interrupted to load the tipple, demurrage charges are in effect.

Problem Download

©1993 by COMAP, Inc.
MCM Problem
Commentary: Yes (2) | Student Papers: Yes (1)

Mathematics Topics:

Math Modeling

Application Areas:

Contest Preparation

You must have a Mathmodels Membership to download Student Papers and Commentary.

If you're already a member, login here.

Not yet a member?